title: "Rate falls to 7.11% as Valley registrations reach $41.7 million"
description: "Seven new registrations total $41,707,990, led by a McAllen renovation. The 30-year rate fell to 7.11%, and Gulf Coast diesel fell to $5.741."
url: "https://fronterasignal.com/issues/2026-w46/"
lang: "en-US"
---

Nov 15, 2026  
Issue 9 · Week 46 of 2026

[Leer en español](https://fronterasignal.com/es/issues/2026-w46/)

[Weekly issue](https://fronterasignal.com/archive/) · Issue 9 · Week 46 of 2026

# Rate falls to 7.11% as Valley registrations reach $41.7 million

[Frontera Signal](https://fronterasignal.com/about/) · Nov 15, 2026 Data as of Nov 15, 2026

Seven new registrations total $41,707,990, led by a McAllen renovation. The 30 year rate fell to 7.11%, and Gulf Coast diesel fell to $5.741.

Key figures

| Key figures | Value | Date and source |
| --- | --- | --- |
| 30 year mortgage rate▼ Week of Nov 12, prior week 7.18% | 7.11% | Nov 12, 2026 · Freddie Mac |
| McAllen months of supplySeptember 2026, Brownsville Harlingen 6.5 | 9.2 | September 2026 · Frontera Signal |
| Gulf Coast diesel, per gallon▼ Week of Nov 9, prior week $5.912 | $5.741 | Nov 9, 2026 · Frontera Signal |
| New commercial registrationsSeven filings through Wednesday | $41,707,990 | Nov 11, 2026 · Frontera Signal |

Seven new commercial registrations through Wednesday total $41,707,990, and a University of Texas renovation in McAllen accounts for $25,300,000 of that, with a listed start of Dec 28. The 30 year mortgage rate fell to 7.11% in the week of Nov 12, from 7.18% the week before. September figures still put the McAllen metro at 9.2 months of supply and Brownsville Harlingen at 6.5, so we would hold a new unsold spec home in Hidalgo County. Six of those registrations still show a listed start ahead of this issue, and those six add to $41,307,990. The package that cannot wait is a commercial plaza in Weslaco, listed start Monday, Nov 16.

## Permits and starts

The McAllen registration covers 46,000 square feet at 1400 E Nolana Ave, a renovation of an existing health building for classrooms, instructional labs, administrative space, and a clinic, listed at $550 a square foot. It names no general contractor. The question before anyone mobilizes for Dec 28 is whether a city building permit is open.

Hidalgo and Cameron counties

### Listed cost on registrations with a start still ahead

Six registrations with a listed start still ahead. Brownsville apartments Feb 1, 2027.

Frontera Signal · Nov 11, 2026

**Show data**

| Item | Value ($) |
| --- | --- |
| McAllen optometry renovation | $25M |
| Brownsville apartments | $12M |
| McAllen warehouse | $3.0M |
| Weslaco commercial plaza | $485K |
| Weslaco clinic addition | $102K |
| Brownsville leasing office | $100K |

The second largest registration is two three story wood frame apartment buildings in Brownsville, 96,170 square feet at 5101 Paredes Line Road, $12,320,550, about $128 a square foot, listed start Feb 1, 2027. A new warehouse with offices in McAllen, 14,212 square feet at 1613 Melba Ave, $3,000,000, about $211 a square foot, lists a start of Jan 1, 2027. The Weslaco plaza, 9,000 square feet at 1803 N. Texas Blvd, $485,000, about $54 a square foot, lists a start of Monday, Nov 16.

Hidalgo and Cameron counties

### Listed start dates still ahead

Verified means the registration was checked this week. A listed start is the date on the registration.

verified announced this week

Frontera Signal · Nov 11, 2026

**Show data**

| Project | Start | End | Status |
| --- | --- | --- | --- |
| Weslaco commercial plaza | Nov 16, 2026 | open | verified |
| Weslaco clinic addition | Nov 30, 2026 | open | verified |
| Brownsville leasing office | Dec 15, 2026 | open | verified |
| McAllen optometry renovation | Dec 28, 2026 | open | verified |
| McAllen warehouse | Jan 1, 2027 | open | verified |
| Brownsville apartments | Feb 1, 2027 | open | verified |

A scanner addition in Weslaco, 788 square feet at $102,440, lists a start of Nov 30. A leasing office rehab in Brownsville, 1,231 square feet at 250 Ash St, $100,000, lists a start of Dec 15. The seventh registration, a $400,000 wellness center in La Feria, 8,000 square feet at about $50 a square foot, lists a start date of Mar 15, 2026, already past, so it stays off the calendar above. The $41,707,990 covers registrations through Wednesday. Friday produced no public total.

Five earlier registrations moved to a finished accessibility review and stay outside that sum: school restrooms in Weslaco at $3,000,000, listed start Dec 1, storage buildings in Edinburg at $4,200,000, listed start Dec 15, an ice cream shop finish in McAllen at $250,000, listed start Dec 1, body shop offices in McAllen at $220,000, whose listed start of Nov 5 has passed, and a restaurant finish in Brownsville at $350,000, listed start Jan 18, 2027.

Harlingen’s October issued sheet, kept out of the $41,707,990, shows four new commercial permits at $19,350,000, including $18,000,000 at 101 W Loop 499 issued Oct 16, and 14 new single family houses at $3,017,419. October is the latest issued count on that sheet. September one unit permits were 334 in Hidalgo County and 140 in Cameron County.

Tuesday, Nov 17, at 5:30 p.m., Weslaco’s agenda asks for an award on 18th Street paving at $394,743. The vote has not been held. A paving cap of $345,000, a lift station design of $188,520, and a water tower design cap of $92,000 sit on the same agenda. Those four add to $1,020,263, outside the registration total. Edinburg meets the same evening at 6 p.m. on a drainage grant request of about $2,875,000, with a preliminary application deadline of Wednesday.

Harlingen meets Wednesday, Nov 18, at 5:30 p.m. The storm sewer engineering fee on Treasure Hills Boulevard is $351,245. The consent agenda accepts a $750,000 Texas Parks and Wildlife grant, and the agenda names no project. The street materials award names no total. Asphalt quotes from the Nov 4 meeting were $82 a ton, up from $72. Minutes from an October 27 planning meeting, published in the Nov 10 packet, cover a 3.25 acre tract at the southeast corner of Bass Pro Drive and Spur 54 and show both a unanimous approval and a following sentence that the item was tabled, with no dollar figure. The city has to say which sentence is the record before material goes on that tract. Zoning text returns Wednesday for a second reading, and an eligible shell could receive a certificate of completion ahead of occupancy.

Mercedes meets Tuesday at 6:30 p.m. on a final plat of 84 lots at FM 491 and Mile 9, with streets about 90 percent in.

## Materials

Gulf Coast diesel was $5.741 a gallon in the week of Nov 9, down 17.1 cents from $5.912. A hauling quote built on the prior week should move to $5.741. The next weekly figure is due Tuesday, Nov 17. Gulf Coast regular gasoline was $3.481 that same week, down from $3.636. Hauling costs follow the diesel price.

Big box shelf, per piece

### Sheathing, studs, rebar, drywall and bag mix

Prices as of Nov 13. These five were unchanged from Nov 10.

Frontera Signal price check · Nov 13, 2026

**Show data**

| Item | Value ($) |
| --- | --- |
| OSB 7/16 sheet | $14.51 |
| Half inch drywall | $14.98 |
| No. 3 rebar, 20 ft | $7.38 |
| Bag mix | $6.24 |
| 2x4 stud | $3.98 |

Big box shelf prices checked Nov 13 were unchanged from Nov 10. The oriented strand board sheet was $14.51, the 2x4 stud $3.98, the 2x6 stud $7.18, number 3 rebar $7.38, half inch drywall $14.98, and a bag of concrete mix $6.24. The concrete block page lists the item as discontinued, so a foundation bid needs a pallet price from the yard.

The producer price index for construction materials stood at 378.610 in September, up 11.03% from a year earlier, so a contingency still belongs on a bid. November lumber’s history close was $491.50 on Nov 12, down $20.00 from $511.50. A framing number that used $511.50 should be checked with the yard. A Nov 10 letter raises dealer prices on sheet metal products by 9%, effective Dec 7. The shelf rebar price stayed $7.38. Hot rolled steel coil was quoted at $1,352 on Nov 12, down from $1,359 on Nov 9, a move of half a percent that bears on sheet rather than rebar. December copper closed at $6.1825 a pound on Nov 12, down 14.6 cents from $6.3285 on Nov 9, so a wire quote written early in the week sits above Thursday’s price.

## Labor

Build time used here is 9 to 11 months. September unemployment was 5.6% in the McAllen metro and 5.9% in Brownsville Harlingen, the latest local rates. August payroll shows Brownsville Harlingen construction employment at 3,600, down 5.3% from a year earlier.

No public note this week named a Valley worksite operation or a wage change. The beach and State Highway 4 closure covered Friday and Saturday. The Pharr bridge’s new span opened Friday at 6 a.m., so a Sunday haul can use that opening and still needs a fresh check that State Highway 4 is open.

A federal agriculture facility at Moore Air Base in Edinburg lists 228 positions this month and a construction completion date of April 2027, with a hiring event Tuesday through Thursday, Nov 17 to 19, from 8 a.m. to 8 p.m. at a McAllen convention center hotel. No build contract or construction dollar accompanies that figure.

## Housing market

Freddie Mac’s national average for a 30 year fixed mortgage was 7.11% as of Nov 12, down from 7.18% on Nov 5. The 15 year rate was 6.45% on the same date, from 6.57% a week earlier. A bid written this week, or a buyer payment quoted this week, should use 7.11%. The next weekly rate is due Thursday, Nov 19.

United States

### 30 year fixed mortgage rate

Weekly national average. Down from 7.18% in the week of Nov 5.

Freddie Mac · Nov 12, 2026

**Show data**

| Period | 30 year |
| --- | --- |
| Oct 1 | 7.28% |
| Oct 8 | 7.4% |
| Oct 15 | 7.4% |
| Oct 22 | 7.32% |
| Oct 29 | 7.24% |
| Nov 5 | 7.18% |
| Nov 12 | 7.11% |

September figures put the McAllen metro at 9.2 months of supply and Brownsville Harlingen at 6.5. Zillow’s September count, as of Sep 30, shows 3,638 homes for sale in the McAllen metro, up 8.11% from a year earlier, and 1,680 in Brownsville Harlingen, down 5.83%. Zillow’s home value index for the same date stood at $188,971 in McAllen, down 0.38% from a year earlier, and $204,552 in Brownsville Harlingen, up 1.28%. The median list price as of Sep 30 was $256,133 in McAllen and $289,736 in Brownsville Harlingen, the latter down 6.46% from a year earlier.

Rio Grande Valley metros

### Months of supply

September figures, the latest activity table available.

Frontera Signal · September 2026

**Show data**

| Item | Value (months) |
| --- | --- |
| McAllen metro | 9.2 months |
| Brownsville Harlingen metro | 6.5 months |

Hakes Brothers’ highest advertised starting price, $271,990 at a Brownsville community, was last checked Oct 9 and has not been reopened since.

## Major projects

A Starbase hearing on Wednesday, Dec 9, at 7 p.m. covers about $24 billion for the initial phases of a gas fired power plant and computing facility on about 444 acres. The notice names no abatement percentage and no start date. The Starbase agenda for Wednesday, Nov 18, asks about a 192.14 acre annexation, a separate tract from that hearing.

Local press describes an August agreement of up to $220 million for Brownsville water and wastewater projects. A company page dated Nov 12 lists $40 million already provided to the city utilities board and a funding gap of about $220 million. The utilities board is the place to ask which contract the $40 million sits on before a water crew is staffed off either figure. Brownsville’s pause on high intensity data processing applications is in effect, and a later story says the city plans to extend it to 180 days.

A Nov 6 story on two 16 inch natural gas pipelines at the Port of Brownsville lists a channel crossing fee of $1,000,000 per pipeline, $100,000 a year in usage per pipeline, and an option on about 14 acres at $122,000 an acre. The dock in that story is still a negotiation. In Pharr, an engineer’s report dated Nov 13 on the dock and agricultural laboratory job lists a revised contract of $45,469,911 and $30,685,164 paid through Sep 25, with construction ongoing and a board meeting Wednesday, Nov 18, at noon. Edinburg’s Chapin Street pump project, $1.44 million, is called complete, with a ribbon cutting Tuesday, Nov 17, at 10 a.m.

## Our view

We would hold a new unsold spec home in Hidalgo County, in the $250,000 to $290,000 band, for the next 60 days, and price any pour or frame that already has a buyer as a buyer’s market against 9.2 months and 7.11%.

Price the McAllen renovation before Dec 28, and price the Weslaco plaza before Monday. The Brownsville apartments list a start of Feb 1, 2027. Hauling quotes move to $5.741, the oriented strand board sheet stays at $14.51, and the September construction price increase of 11.03% still warrants a contingency. Build time stays 9 to 11 months.

## Forecast record

| Forecast | Due | Status |
| --- | --- | --- |
| Hold a new unsold Hidalgo spec in the $250,000 to $290,000 band | Jan 14, 2027 | OPEN |
| Weslaco commercial plaza, listed start Nov 16 | Nov 23 | OPEN |
| McAllen optometry renovation, listed start Dec 28 | Jan 4, 2027 | OPEN |
| Brownsville apartments, listed start Feb 1, 2027 | Feb 8, 2027 | OPEN |
| Gulf Coast diesel holds near $5.741 | Nov 17 | OPEN |
| Big box OSB sheet holds at $14.51 | Nov 17 | OPEN |
| McAllen supply shows no rescue from 9.2 months | Jan 14, 2027 | OPEN |
| Brownsville data center pause stays in effect through Feb 3, 2027 | Feb 3, 2027 | OPEN |
| Concrete block price waits on a yard pallet quote | Nov 17 | OPEN |
| Starbase civic building, listed start Dec 1 | Dec 8 | OPEN |
| McAllen distribution alterations, listed start Nov 18 | Nov 25 | OPEN |
| Weslaco clinic finish out, listed start Nov 23 | Nov 30 | OPEN |
| Harlingen maintenance building, listed start Dec 30 | Jan 6, 2027 | OPEN |

Our call that Gulf Coast diesel would hold near $5.912 until the next weekly figure was a MISS. The week of Nov 9 came in at $5.741, down 17.1 cents. The big box oriented strand board sheet held at $14.51 through Nov 13, a HIT. The concrete block page still lists the item as discontinued, with no per piece price, a HIT on the call that a foundation waits on a yard quote. The two McAllen finish outs on East Dove still show a finished accessibility review, a HIT on the Nov 9 call.

_Housing market data: Zillow and Freddie Mac._

This issue as JSON: [`GET /api/v1/issue?week=2026-W46&lang=en`](https://fronterasignal.com/api/v1/issue?week=2026-W46&lang=en), $0.25 per call. [How paying works](https://fronterasignal.com/data/#pay)

Cite as: Frontera Signal, “Rate falls to 7.11% as Valley registrations reach $41.7 million”, Nov 15, 2026. [https://fronterasignal.com/issues/2026-w46/](https://fronterasignal.com/issues/2026-w46/)